Background tasks
Background-task cards appear in Repository Settings. Their settings belong to the open project on your computer.
Remote checks
Section titled “Remote checks”Remote Sync contains Auto-sync with Remote. The switch enables periodic fetches. Run every accepts intervals from 1 to 120 minutes.
A fetch updates the local record of remote branches and tags. It does not merge incoming commits into your active branch or upload your saves.
The procedure is in Configure remote checks.
Large-file downloads
Section titled “Large-file downloads”Large Files (LFS) contains Auto-download Large Files. Run Now fetches recent LFS objects. The schedule controls and the additional download and cleanup settings are marked Coming Soon.
LFS setup is in Configure large files with Git LFS.
Repository maintenance
Section titled “Repository maintenance”Performance contains Auto-optimize Repository and Optimization Tasks. Run Now runs the selected maintenance tasks. The schedule switch and interval are marked Coming Soon.
The procedure is in Run repository maintenance.
Task results
Section titled “Task results”Each card has Run Now for an immediate attempt. Last run shows the last recorded execution time. A failed attempt adds Failed to that result.
Project settings are unavailable while another project operation is in progress. A fetch or maintenance error does not by itself mean your project files are lost.